Wilfred Brown Building

New planting at Wilfred Brown bed is starting to grow now, the angles reflect the frontage of the building with section left for the STEM centre activities if so required .

Bird life

Do look out for our pair of Mandarin ducks, they will be close to the water but nest in suitable hollows and holes in trees,the male is one of the most colourful ducks you will see, they make very little noise ,originally from eastern Asia.

Pond again

Plenty of activity going on in the small dipping pond by the board walk, the frog spawn has hatched out with tadpoles in abundance but the overgrown vegetation and dead foliage still needs to be thinned and cleared. After surveying the area maintenance has now resumed with the reduction of the Glyceria  and removing the dead foliage, a small gap has been created for the frogs to exit the pond when ready, the material removed has been left on the side for a few hours so any of the small insects, amphibians and other larvae can return to the water. Soon be starting on the main part of the pond.

Pond

Have you seen the frog spawn that has appeared for the first time, as far as we are aware, in the small dipping pond by the boardwalk, this is great to see. The dead foliage needs to be carefully removed and the fish exclusion curtain will be checked it is still in place. Maintenance work is in place for the pond including removal of debris and detritus extending the fish exclusion curtain on the reed beds, and liquid feeding the plants, we may also have to build a small ladder for the young frogs to climb out of the pond when the time is right.

Landscaping

The Grounds team have been very busy this winter clearing up areas where damage has been done by the numerous projects that take place on campus. The upgrade of the access road in preparation for the Learning and Teaching Centre being one example. A temporary road was created straight through a large shrubbery near the Howell building with the ripped up plants just left in situ. The team have cleared away the debris  and opened up the space ready for new understory planting which will be designed to enhance the biodiversity in the area.

Tree work

Had to take down the Robinia pseudoacacia due to basal infection and decay in the stem-not the best location either being on the main spine and leaning over Marie Jahoda building  however managed to borrow the cherry picker to breakdown the tree in manageable sections. Left part of the trunk standing at the moment until we can have the stump removed.

Christmas

The Christmas tree had to be relocated from the quad due to the Crank building works at short notice, it now has a new home near the Indoor Athletic Centre and Eastern Gateway entrance making it easier to crane into place, around 80 metres of lights have been used to decorate the 24ft tree seen here in a rather blurred photo.